40 CFR §82.156 · §82.157 · 40 CFR Part 84 Subpart C
EPA 608 Study Guide & 40 CFR Reference Tables
Verified regulatory thresholds for Core, Type I, Type II, and Type III certification—compiled directly from 40 CFR Part 82 Subpart F and 40 CFR Part 84, paired with an interactive lookup
flash drill and a 2-page printable PDF reference sheet.
1. Required Evacuation Vacuum Levels (40 CFR §82.156 Table 1)
Before opening an appliance for major service/repair or final disposal, recover refrigerant to the threshold determined by appliance pressure class, charge size, and recovery equipment manufacture date (before vs. on/after November 15, 1993).
| Appliance Category | Equipment Before 11/15/1993 | Equipment On/After 11/15/1993 | Authority |
|---|---|---|---|
| Type I Small Appliances (<= 5 lbs, operating compressor) | 80% OR 4 in. Hg | 90% OR 4 in. Hg | 40 CFR §82.156(b) |
| Type I Small Appliances (<= 5 lbs, non-operating compressor) | 80% OR 4 in. Hg | 80% OR 4 in. Hg | 40 CFR §82.156(b) |
| Type II Very High-Pressure (> 355 psia at 104°F) | 0 in. Hg (0 psig) | 0 in. Hg (0 psig) | 40 CFR §82.156 Table 1 |
| Type II High-Pressure (< 200 lbs charge, e.g. R-410A, R-22) | 0 in. Hg (0 psig) | 0 in. Hg (0 psig) | 40 CFR §82.156 Table 1 |
| Type II High-Pressure (>= 200 lbs charge, e.g. R-410A, R-22) | 4 in. Hg vacuum | 10 in. Hg vacuum | 40 CFR §82.156 Table 1 |
| Type II Medium-Pressure (< 200 lbs charge, e.g. R-134a, R-12) | 4 in. Hg vacuum | 10 in. Hg vacuum | 40 CFR §82.156 Table 1 |
| Type II Medium-Pressure (>= 200 lbs charge, e.g. R-134a, R-12) | 4 in. Hg vacuum | 15 in. Hg vacuum | 40 CFR §82.156 Table 1 |
| Type III Low-Pressure (< 45 psia at 104°F, e.g. R-123, R-11) | 25 mm Hg absolute | 25 mm Hg absolute | 40 CFR §82.156 Table 1 |
Non-major repair exception (40 CFR §82.156(a)(1)): If evacuation of the appliance to the atmosphere is not to be performed after service and the maintenance, service, or repair is not major (§82.152), evacuate medium-, high-, or very-high-pressure appliances to no higher than 0 psig before opening (or pressurize low-pressure appliances to no higher than 0 psig; for oil changes under §82.156(a)(1)(iii), evacuate or pressurize to no higher than 5 psig).
Leak exception (40 CFR §82.156(a)(2)): Separate from non-major repairs, if leaks make
Table 1 evacuation unattainable or pulling a vacuum would substantially contaminate recovered refrigerant, isolate leaking from
non-leaking components wherever possible, evacuate non-leaking parts to full Table 1
levels, and evacuate leaking components to the lowest level that can be attained without
substantially contaminating the refrigerant—that level may not exceed 0 psig (0 psig is
an upper ceiling, not a stop target).
2. Leak Repair Thresholds: 40 CFR §82.157 vs. AIM Act 40 CFR §84.106
Do not conflate 40 CFR §82.157 (appliances holding ≥ 50 lbs of ODS
refrigerants) with 40 CFR §84.106 (AIM Act Subpart C rule covering appliances holding
≥ 15 lbs of HFCs or substitutes >53 GWP starting January 1, 2026—excluding
appliances in the residential and light commercial air conditioning and heat pump subsector under
40 CFR §84.106(a)(3)(ii)).
| Appliance Sector | Annual Trigger Rate | 40 CFR Part 82 Scope | 40 CFR Part 84 Scope | Required Action & Records |
|---|---|---|---|---|
| Industrial Process Refrigeration (IPR) | 30% annualized | >= 50 lbs ODS (40 CFR §82.157) | >= 15 lbs HFC/sub >53 GWP (§84.106, eff. Jan 1, 2026) | 30 days repair (120 days if process shutdown) (3-yr records) |
| Commercial Refrigeration | 20% annualized | >= 50 lbs ODS (40 CFR §82.157) | >= 15 lbs HFC/sub >53 GWP (§84.106, eff. Jan 1, 2026) | 30 days repair + initial & 10-day follow-up test (3-yr records) |
| Comfort Cooling (Chillers / Non-Excluded) | 10% annualized | >= 50 lbs ODS (40 CFR §82.157) | >= 15 lbs HFC/sub >53 GWP; excludes res./light-comm. AC & HP (§84.106(a)(3)(ii)) | 30 days repair + initial & 10-day follow-up test (3-yr records) |
3. Recovery Cylinders, DOT Rules & Core Safety
| Topic | Standard / Limit | Regulatory Basis |
|---|---|---|
| Recovery Cylinder Color | Gray body with a yellow top (shoulder) | 40 CFR §82.158 / AHRI Guideline N |
| Maximum Liquid Fill | 80% capacity by weight (leaves 20% vapor space for thermal expansion) | 49 CFR §173.304 |
| Hydrostatic Test Interval | Every 5 years for DOT-4BA / DOT-4BW refillable tanks | 49 CFR §180.209 |
| Disposable DOT-39 Cylinders | Single-use only; never refill or recover into DOT-39 | 49 CFR §178.65 |
| R-410A Cylinder Rating | Minimum 400 psig service pressure (DOT-4BA400 / DOT-4BW400) | 40 CFR §82.158 / 49 CFR §173.304 |
| ASHRAE 34 Classes | A1 (lower toxicity, no flame) · A2L (lower flammability, e.g. R-32/R-454B) · B1 (R-123) | 40 CFR Part 82 Subpart G (SNAP) |
| Leak-Test / Brazing Purge Gas | Regulated dry nitrogen only; never oxygen or compressed shop air | 40 CFR §82.154 & OSHA Safety |
4. Type III Low-Pressure Chiller Service Sequence (R-11 / R-123)
- Protect against sub-32°F tube freezing: Keep chilled-water and condenser-water pumps circulating (or drain water boxes) whenever refrigerant pressure drops below the 32°F saturation point during recovery.
- Energize the oil sump heater (~130°F): Low-pressure refrigerants dissolve heavily in cold oil; warming the oil releases trapped vapor so recovery holds at 25 mm Hg absolute.
- Check standing pressure rise: Wait several minutes after shutting off recovery; rising vacuum pressure signals residual boiling refrigerant or an external air leak.
- Protect the 15 psig rupture disc during leak checks: Never exceed 10 psig with regulated dry nitrogen, or raise R-123 vapor pressure slightly above 0 psig by circulating warm water.
- Purge unit & vapor-first charging: Purge units pull non-condensables from the top of the condenser. After deep evacuation, charge vapor first until internal pressure exceeds the 32°F saturation threshold before adding liquid refrigerant.
Quick Regulation Lookup & Self-Check Flash Drill
Search all 55 regulation-cited questions by CFR section, keyword (for example,
82.157, Part 84, 25 mm Hg, rupture), or section—or
download the standalone 2-page PDF cheat sheet.